Project Quality and Risk Managementإدارة جودة المشروع ومخاطره

الشريحة 1 من 20

مقدمة الفصل

ماذا ستتعلم في هذا الفصل

  1. Define quality and project quality management.
  2. Describe quality planning and its relationship to project scope management.
  3. Discuss the importance of quality assurance.
  4. Explain the main outputs of the quality control process.
  5. Understand the tools and techniques for quality control.
  6. Understand the basics of the risk management process.
تفاصيل المصدرالمحاضرة 7 · الشريحة ⁦2⁩
المصدر
المحاضرة 7 · الشريحة ⁦2⁩
ملاحظات حول المصدر (1)
  • تذكر الشريحة 43 أن الشكوى الأولى (90 من 175) تمثل 55%، والحساب يعطي نحو 51%. أما «قرابة 80%» للشكويين الأوليين في الشريحة 44 فصحيحة (140 ÷ 175 = 80%).

What is quality?ما الجودة؟

Quality and project quality management

Where this lecture sits (slide 3): the knowledge-area / process-group table, with the arrow at Project Quality Management
InitiatingPlanningExecutingMonitoring & ControlClosing
—Plan quality managementPerform quality managementControl qualityلا تذكر الشرائح شيئًا هنا.

Quality:

  • The totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs. (ISO 8042:1994)
  • The degree to which a set of inherent characteristics fulfils requirements. (ISO 9000:2000)

Conformance to requirementsالمطابقة للمتطلبات

  • The project's processes and products meet written specifications.
  • Example: the scope statement requires 100 computers with specific processors and memory — you can easily check whether suitable computers were delivered.

Fitness for useالملاءمة للاستخدام

  • A product can be used as it was intended.
  • Example: computers delivered without monitors or keyboards and left in boxes on the shipping dock are not fit for use; the customer may have assumed delivery included them, unpacking and installation.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦4–6⁩
المصدر
المحاضرة 7 · الشرائح ⁦4–6⁩

Project quality management processesعمليات إدارة الجودة

Quality and project quality management

Project quality management
Includes the processes required to ensure that the project will satisfy the needs for which it was undertaken.
من الشريحة 8
ProcessالعمليةDescriptionالوصفOutputالمخرجات
1. Planning quality managementIdentifying which quality requirements and standards are relevant to the project and how to satisfy them.
  • Quality management plan
  • process improvement plan
  • quality metrics
  • quality checklists
  • project document updates
2. Performing quality assurancePeriodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standard.
  • Change requests
  • project management plan updates
  • project documents updates
  • organizational process asset updates
3. Controlling qualityMonitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality.
  • Quality control measurements
  • validated changes
  • validated deliverables
  • work performance information
  • change requests
  • project management plan updates
  • project documents updates
  • organizational process asset updates
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦7–8⁩
المصدر
المحاضرة 7 · الشرائح ⁦7–8⁩

سؤال سريع

Quality and project quality management

A supplier delivers exactly the 50 laptops described in the contract, but they arrive without power adapters, so staff cannot use them. In quality terms, the delivery…

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦5–6⁩
المصدر
المحاضرة 7 · الشرائح ⁦5–6⁩

1. Planning qualityتخطيط الجودة

Planning quality and scope aspects that affect quality

To identify relevant quality standards for each unique project and to design quality into the products of the project and the processes involved in managing the project.

Prevention of defects by:

  • Selecting proper materials.
  • Training people in quality.
  • Planning a process that ensures the appropriate outcome.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦9–10⁩
المصدر
المحاضرة 7 · الشرائح ⁦9–10⁩

Scope aspects of IT projects that affect qualityجوانب النطاق المؤثرة في الجودة

Planning quality and scope aspects that affect quality

من الشرائح 11–16
AspectالجانبMeaningالمعنىWhat to clarifyما يجب توضيحه
Functionality and featuresFunctionality: the degree to which a system performs its intended function. Features: the system's special characteristics that appeal to users.What functions and features the system must perform, and what is optional.
System outputsThe screens and reports the system generates (user interface).
  • What the screens and reports look like
  • can users easily interpret them
  • can they get all the reports they need in a suitable format?
PerformanceHow well a product or service performs the customer's intended use.
  • Volumes of data and transactions
  • simultaneous users
  • projected growth rate in users
  • type of equipment
  • response time.
ReliabilityThe ability of a product or service to perform as expected under normal conditions.
  • Detecting an error and, if possible, correcting the corruption
  • system recovery.
MaintainabilityThe ease of performing maintenance on a product.Most IT products cannot reach 100 percent reliability, but stakeholders must define their expectations — e.g. provide a help desk.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦11–16⁩
المصدر
المحاضرة 7 · الشرائح ⁦11–16⁩

2. Performing quality assuranceضمان الجودة

Quality assurance and quality control outputs

Quality assurance includes all the activities related to satisfying the relevant quality standards for a project. Another goal is continuous quality improvement.
Benchmarkingالمقارنة المرجعية
Generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization.
Quality auditتدقيق الجودة
A structured review of specific quality management activities that helps identify lessons learned that could improve performance on current or future projects.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦17–19⁩
المصدر
المحاضرة 7 · الشرائح ⁦17–19⁩

3. Performing quality controlضبط الجودة ومخرجاته

Quality assurance and quality control outputs

Monitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality. The main goal of quality control is to improve quality.

تذكّر المخرجات الثلاثة ثم اكشف شرحها.

  1. 1Acceptance decisionsقرارات القبول
  2. 2Reworkإعادة العمل
  3. 3Process adjustmentsتعديل العمليات

أدوات ضبط الجودة (الشريحة 25)

  • Seven basic tools of quality
  • Statistical sampling
  • Six Sigma
  • Testing
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦20–24⁩
المصدر
المحاضرة 7 · الشرائح ⁦20–24⁩

سؤال سريع

Quality assurance and quality control outputs

Which is one of the main outputs of quality control?

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦21–24⁩
المصدر
المحاضرة 7 · الشرائح ⁦21–24⁩

Seven basic tools: cause-and-effect and control chartsالسبب والنتيجة ومخطط الضبط

Quality control tools: the seven basic tools

الأدوات السبع (الشريحة 26)

  • Cause-and-effect diagrams
  • Control charts
  • Check sheet
  • Scatter diagrams
  • Histogram
  • Pareto chart
  • Flowcharts
Cause-and-effect diagrams
Trace complaints about quality problems back to the responsible production operations; they help you find the root cause of a problem. Also known as fishbone diagrams. You can also use the 5 Whys technique: repeatedly ask “Why” to peel away the layers of symptoms.

Slide 28 sample — problem “Users cannot get into system”, with causes grouped under Training (user did not reset password, did not check box to save password, keeps forgetting password), Software, System Hardware and User's Hardware (not enough memory, not enough hard disk storage, processor too slow).

Control chart
A graphic display of data that illustrates the results of a process over time; it lets you determine whether a process is in control or out of control.

In controlتحت السيطرة

  • Variations are created by random events.
  • The process does not need to be adjusted.

Out of controlخارج السيطرة

  • Variations are caused by nonrandom events.
  • Identify the causes and adjust the process to correct or eliminate them.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦26–32⁩
المصدر
المحاضرة 7 · الشرائح ⁦26–32⁩

Check sheets, scatter diagrams and histogramsورقة الفحص والانتشار والمدرج

Quality control tools: the seven basic tools

Check sheetورقة الفحص
Used to collect and analyze data; sometimes called a tally sheet or checklist. Tally marks enter each occurrence manually. In the slide 34 example, most complaints arrive via text message, with more complaints on Monday and Tuesday.
Scatter diagramمخطط الانتشار
Helps to show if there is a relationship between two variables; the closer data points are to a diagonal line, the more closely the two variables are related. Example: user satisfaction ratings compared with the age of respondents.
Histogramالمدرج التكراري
A bar graph of a distribution of variables; each bar represents an attribute or characteristic of a problem, and its height represents its frequency.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦33–39⁩
المصدر
المحاضرة 7 · الشرائح ⁦33–39⁩

Pareto charts and flowchartsباريتو والمخطط الانسيابي

Quality control tools: the seven basic tools

Pareto chart
A histogram that can help you identify and prioritize problem areas. Pareto analysis is also called the 80-20 rule: 80 percent of problems are often due to 20 percent of the causes.
  • Slide 41 (3.1.6 Pareto Chart) is a video titled "80/20"; slide 54 (Six Sigma) is a video, "Six Sigma — A Simple explanation"; slide 70 is a video (IBM, ibm.com/smartercommerce). Their content is not on the slides.
مثال شكاوى المستخدمين (الشريحة 43) — المجموع 175
ComplaintNumber of people
Login problem90
System locks up50
System is too slow20
System is too hard to use10
Reports are inaccurate5

The first and second complaints together account for almost 80 percent of the total, so the company should focus on making it easier to log in to the system.

Flowcharts
Graphic displays of the logic and flow of processes that help you analyze how problems occur and how processes can be improved. They show activities, decision points, and the order of how information is processed.

Slide 47 flowchart: deliverable acceptance

  1. 1

    Deliverable acceptance request.

  2. 2

    Route to appropriate decision makers.

  3. 3

    Accepted? YES → sign approval section. NO → document required additional work.

  4. 4

    Notify requestor and log in system.

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦40, 42, 43, 44, 45, 46, 47⁩
المصدر
المحاضرة 7 · الشرائح ⁦40, 42, 43, 44, 45, 46, 47⁩
ملاحظات حول المصدر (1)
  • تقول الشريحة 43 إن الشكوى الأولى تمثل 55%، والحساب (90 ÷ 175) يعطي نحو 51%.

سؤال سريع

Quality control tools: the seven basic tools

A help desk logs 100 complaints: printing errors 62, slow startup 20, wrong dates 10, missing icons 5, others 3. Following Pareto analysis, what should the team do first?

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦40, 42, 43, 44⁩
المصدر
المحاضرة 7 · الشرائح ⁦40, 42, 43, 44⁩

Statistical samplingالمعاينة الإحصائية

Choosing part of a population of interest for inspection. The size of the sample depends on how representative you want it to be.
  • Sample size = 0.25 × (certainty factor / acceptable error)²
  • The certainty factor denotes how confident you want to be that the sampled data includes only variations that naturally exist in the population; it comes from tables in statistics books.
  • Acceptable error = 1 − percent certainty / 100 (95 percent certainty → 1 − 95/100 = 0.05).

المسألة

EDI system developers accept a 95 percent certainty that a sample of invoices contains no variation unless it is present in the population.

خطوات الحل

  1. Acceptable error = 0.05; certainty factor = 1.960
  2. Sample size = 0.25 × (1.960 / 0.05)²

النتيجة

Sample size = 384

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦50–53⁩
المصدر
المحاضرة 7 · الشرائح ⁦50–53⁩

Six Sigma and testingسيجما ستة والاختبار

Six Sigma
“A comprehensive and flexible system for achieving, sustaining and maximizing business success … driven by close understanding of customer needs, disciplined use of facts, data, and statistical analysis, and diligent attention to managing, improving, and reinventing business processes.” (Pande, Neuman and Cavanagh, The Six Sigma Way)

DMAIC — five-phase improvement process (slides 56–57)

  1. Define

    Define the problem statement and plan for improvement; the Six Sigma project team is formed.

  2. Measure

    Collect data from the process to determine current quality or operational performance levels.

  3. Analyze

    Study the business process to understand the root causes of the problem.

  4. Improve

    Identify, prioritize, test, and finalize the improvement action plan.

  5. Control

    Implement the improvement action plan and set up controls to monitor the system.

Many IT professionals think of testing as a stage near the end of development, but testing should be done during almost every phase of the IT product development life cycle.

أنواع الاختبار (الشريحتان 59–60)
Testing typeالنوعWhat it testsماذا يختبر
Unit testingEach individual component (often a program) to ensure it is as defect-free as possible.
Integration testingOccurs between unit and system testing to test functionally grouped components.
System testingThe entire system as one entity.
User acceptance testingAn independent test performed by end users prior to accepting the delivered system.
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦55–60⁩
المصدر
المحاضرة 7 · الشرائح ⁦55–60⁩

سؤال سريع

Statistical sampling, Six Sigma and testing

Which testing type is an independent test performed by end users before accepting the delivered system?

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦59–60⁩
المصدر
المحاضرة 7 · الشرائح ⁦59–60⁩

Project risk managementإدارة المخاطر

Where risk management sits (slide 62): the knowledge-area / process-group table, with the arrow at Project Risk Management (slide 61 is the section title)
InitiatingPlanningExecutingMonitoring & ControlClosing
—Plan risk management, identify risks, perform qualitative risk analysis, perform quantitative risk analysis, plan risk responsesلا تذكر الشرائح شيئًا هنا.Control risksلا تذكر الشرائح شيئًا هنا.
Risk
An uncertainty that can have a negative (threats) or positive (opportunities) effect on meeting project objectives. Examples: customer not agreeing on the price; not finding a capable supplier; delivery difficulties.
Project risk management
A process in which the project team continually assesses what risks may negatively or positively affect the project, determines the probability of such events occurring, and determines the impact if they occur. It also involves analyzing and determining alternate strategies to deal with risks.

The objectives of risk management are to identify, address and minimize risks before they become threats to the successful completion of a project.

تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦61–67⁩
المصدر
المحاضرة 7 · الشرائح ⁦61–67⁩

Risk management processesعمليات إدارة المخاطر

Project risk management

من الشريحتين 68–69
ProcessالعمليةDescriptionالوصفOutputالمخرجات
1. Planning risk managementDeciding how to approach and plan the risk management activities for the project.Risk management plan
2. Identifying risksDetermining which risks are likely to affect a project and documenting the characteristics of each.Risk register
3. Performing qualitative risk analysisPrioritizing risks based on their probability and impact of occurrence.Project documents updates
4. Performing quantitative risk analysisNumerically estimating the effects of risks on project objectives.Project documents updates
5. Planning risk responsesEnhancing opportunities and reducing threats to meeting project objectives.
  • Project management plan updates
  • project documents updates
6. Monitoring and controlling risksMonitoring identified and residual risks, identifying new risks, carrying out risk response plans, and evaluating the effectiveness of risk strategies.
  • Work performance information
  • change requests
  • project management plan updates
  • project documents updates
  • organizational process assets updates
تفاصيل المصدرالمحاضرة 7 · الشرائح ⁦68–69⁩
المصدر
المحاضرة 7 · الشرائح ⁦68–69⁩

سؤال سريع

Project risk management

Which risk management process prioritizes risks based on their probability and impact of occurrence?

تفاصيل المصدرالمحاضرة 7 · الشريحة ⁦68⁩
المصدر
المحاضرة 7 · الشريحة ⁦68⁩

الخلاصة

تفاصيل المصدر
المصدر
المحاضرة 7

خريطة الفصل

    1. 1مقدمة الفصل
  1. Quality and project quality managementالجودة وإدارة جودة المشروع

    1. 2What is quality?ما الجودة؟
    2. 3Project quality management processesعمليات إدارة الجودة
    3. 4سؤال سريع: المطابقة والملاءمة
  2. Planning quality and scope aspects that affect qualityتخطيط الجودة وجوانب النطاق المؤثرة فيها

    1. 51. Planning qualityتخطيط الجودة
    2. 6Scope aspects of IT projects that affect qualityجوانب النطاق المؤثرة في الجودة
  3. Quality assurance and quality control outputsضمان الجودة ومخرجات ضبطها

    1. 72. Performing quality assuranceضمان الجودة
    2. 83. Performing quality controlضبط الجودة ومخرجاته
    3. 9سؤال سريع: مخرجات ضبط الجودة
  4. Quality control tools: the seven basic toolsأدوات ضبط الجودة السبع

    1. 10Seven basic tools: cause-and-effect and control chartsالسبب والنتيجة ومخطط الضبط
    2. 11Check sheets, scatter diagrams and histogramsورقة الفحص والانتشار والمدرج
    3. 12Pareto charts and flowchartsباريتو والمخطط الانسيابي
    4. 13سؤال سريع: تحليل باريتو
  5. Statistical sampling, Six Sigma and testingالمعاينة الإحصائية وسيجما ستة والاختبار

    1. 14Statistical samplingالمعاينة الإحصائية
    2. 15Six Sigma and testingسيجما ستة والاختبار
    3. 16سؤال سريع: أنواع الاختبار
  6. Project risk managementإدارة مخاطر المشروع

    1. 17Project risk managementإدارة المخاطر
    2. 18Risk management processesعمليات إدارة المخاطر
    3. 19سؤال سريع: التحليل النوعي
    1. 20الخلاصة